NVH Console

Loading Map....

Sun
Mon
Tue
Wed
Thu
Fri
Sat
S
M
T
W
T
F
S
30
31
1
2
3
4
5
6
7
8
9
10
9:00 AM - META Basics
11
12
13
14
15
9:00 AM - NVH Console
16
17
18
19
20
21
22
23
25
26
27
28
29
30
1
2
3
08 Apr
Apr 8, 2025 - Apr 9, 2025    
9:00 am - 4:00 pm
10 Apr
Apr 10, 2025    
9:00 am - 4:00 pm
meta_basics
15 Apr
Apr 15, 2025 - Apr 17, 2025    
9:00 am - 4:00 pm
24 Apr
Apr 24, 2025 - Apr 25, 2025    
9:00 am - 4:00 pm
Events on Apr 8, 2025
08 Apr
8 Apr 25
Farmington Hills
Events on Apr 9, 2025
08 Apr
8 Apr 25
Farmington Hills
Events on Apr 10, 2025
10 Apr
10 Apr 25
Farmington Hills
Events on Apr 15, 2025
15 Apr
15 Apr 25
Farmington Hills
Events on Apr 16, 2025
15 Apr
15 Apr 25
Farmington Hills
Events on Apr 17, 2025
15 Apr
15 Apr 25
Farmington Hills
Events on Apr 24, 2025
24 Apr
24 Apr 25
Farmington Hills
Events on Apr 25, 2025
24 Apr
24 Apr 25
Farmington Hills

Date/Time
Aug 12, 2025 - Aug 14, 2025
9:00 am - 4:00 pm

Location
BETA CAE Systems USA Office
29800 Middlebelt Road Ste 100
Farmington Hills MI
United States

Fee: $1500

  • Introduction to NVH Console
    • Overall GUI, plugins solution (refresh issue)
    • Working directory, settings
  • Open Assembly (XML) & ANSA Database
    • Difference between using ANSA database & XML
    • Resizing boxes, align, zoom, rotate
    • Highlight, show only
  • Creating Components
    • Conception of owners
    • General components
    • FS group
  • Create the demo model (all components)
    • Rigid bodies
    • Bean stiffeners
    • Creating Connectors
      • Manual
      • Auto
      • XML
      • Different type of connectors
        • UJOINT
        • CBUSH
        • Rigid
        • MPC
    • Exercise: Connectors
    • Local Coordinate Systems
      • All 4 methods
    • Load case Manager
      • Configurations, edit modal model
      • Exclusive groups (create exclusive groups)
    • Changing Representations
      • Modal, FRF, ASCII
      • Switch between different representations
    • Output XML, sharing by ANSA database
    • Updating Console Model (counter measure development)
      • New bulk data file
      • Running only few components (“used”)
    • Load case setup
      • Simple loads, multi load creation
      • Participations
      • Energy responses
    • Running NASTRAN
      • System modes
      • System FRF
    • Standard Load cases
      • Job submission